Reconfigure Izmir ATA Entry Control Point
Walls for door opening have been demolished. Existing videophone, existing exterior door and glazing adjacent to the door andX-ray machine and detector have been relocated. Marble cladding has been installed. New handrail, steel automatic roll-down shutter have been installed.