New Food Warehouse Building, Vehicle Parking Building, POL Warehouse Building, Power Center Building and Fuel Pump Building were built in Malatya Kürecik region. The new buildings were constructed as a reinforced concrete foundation, reinforced concrete carcass, steel framed steel roof, and the infrastructures of all buildings (including wastewater, clean water, fuel, communication, power lines and mechanical systems), 2 prime power generators and 2 standby power units. generator system has been installed.