We demolished all corner posts and install new ones in accordance with security specifications. We replaced line/pull posts to meet the specified tensioning of the existing fence. We installed a new fence with barbed wire at the entrance area. We tensioned the existing fence to meet security specifications. We constructed reinforced concrete infrastructure for 3-meter, 6-meter, and 9-meter-high camera poles and installed the poles, which include the installation of high-security cameras, in accordance with security specifications. We installed all the necessary power and communication panels on the camera towers. We constructed the infrastructure for communication and power lines, complete with manholes that meet the specifications for the security system. We installed power and communication cables for the security system. We installed an automatic transfer switch, 150A 208VAC/60Hz. We installed a 110/208V generator, 60Hz, 45kW. We installed a transformer 208/480V 30KVA. We installed an access control system for several buildings. We tested the system with government representatives for 15 days.