Snow Tunnel Construction, Kurecik Radar Site
3 snow tunnels were built in Malatya. Within the scope of the project, necessary excavation works, backfills and foundation concrete, all infrastructure works required for rainwater, construction of steel structure columns and profiles, steel sheet coating, installation of the necessary were included the lighting system.