Repair Valves and Perform 5-Year Hydrostatic Pressure Testing of Fuel Piping at Incirlik AB, Turkey
The intent of this project is to perform a 5-years hydrostatic pressure test revise and update the existing Pipeline Integrity Management Plan/Program (PIMP) for all piping at the Incirlik AB Turkey.
Aytekin Serol will inspect and repair pipeline and replace 32 each existing gate valves with double block and bleed valves and repair the damaged pipe near the Facility 2109 at Incirlik Air Base.