Install New Transformer Substation #TR-50

Kontrat No / Contrat No : FA5685-15-D-0002-FA568517F0102

Kontrat Tutarı / Contract Amount : $102.888,84

Müşteri / Client : USAF39 CONS/ LGCA

The purpose of this project is to Design, provide and install new transformer substations complete with 250kVA, 10-4.16 kV/0.400-0.208 kV, dual voltage (±2×2.5 tap), copper/copper winding, dry type transformer (ABB or equal) w/cooling fan, CCV type RMU ( 24V Motorized V module, ABB or equal), dual voltage Form 4B type LV panelboard, lighting, W.P. walk –in enclosure, grounding and concrete foundation.